Compatibility check
Three inputs. One honest answer about the control path.
This tool maps a device type, protocol and engagement model to an engineering path. It does not certify a brand or promise a specific model will work — those answers require a sample and a test plan.
Start here
What has to be controlled, and how?
Most projects fall into one of three paths: a standard platform with configuration, a prototype program for a link we have not built yet, or a scope review where the protocol is still unclear.
The result is a starting point for a conversation. A definitive compatibility answer requires the device list, a receiver sample and a written test plan.
Describe the control target.
Scope review
The link cannot be identified from the information given; start with a scope review.
Take this to the briefStart here
What has to be controlled, and how?
Most projects fall into one of three paths: a standard platform with configuration, a prototype program for a link we have not built yet, or a scope review where the protocol is still unclear.
The result is a starting point for a conversation. A definitive compatibility answer requires the device list, a receiver sample and a written test plan.
Checker
Path first, quotation second.
The answer comes from the link and the receiver, not from a catalogue.
Pick all three. The result can be carried into the enquiry form, parameters filled in.
Reading the result
Three statuses, three different commitments.
We have done this before
The link is on an existing platform. The work is configuration, code coverage and validation against your device list. A functional prototype usually follows 3–5 weeks after the specification is agreed.
The link needs proving
The radio or protocol is feasible but not yet demonstrated on our hardware. We scope an engineering review and a prototype before committing to a production schedule.
The brief is not defined yet
We need the device model, a sample remote or the protocol document before quoting. The first deliverable is a gap list, not a price.
Definitive answer
What turns a path into a commitment.
A compatibility claim is only as good as the evidence behind it. For a production program, we replace the checker’s estimate with a test report.
- A device list with models and regions
- One sample remote or receiver per device family
- The protocol document, if the link is digital
- Target markets and certification scope
- An agreed definition of “working” — keys, latency, range
- Coverage reported as tested models, not a percentage claim
- A gap list for models that could not be verified
- A protocol test plan with pass/fail cases
- A signed report before tooling release
- Certification copies only for the exact model and market
Questions
Compatibility FAQ
Why can’t you just say a brand is supported?
Is the checker result a quotation?
Can you test a receiver we already have in production?
What if the protocol is undocumented?
Related: Protocols & Integration Customization
Next step
Turn the estimate into a test plan.
Send the device list and a sample. We will tell you what is tested, what is a gap and what it costs to close it.